DLO – Make It Work – Shoe Rack – The 5 Musketeers

Introduction: This term for our DLO team 5 had to make a project that would improve team 5/school. Our theme was “Make It Work”. Everyone in team 5 had to get into groups of 5-6 people. Each group had to make one project each. What we basically had to do was find a project that we wanted to create, research about it, and then create it. Our group was called “The 5 Musketeers”. This term we are studying TECHNOLOGY. We’re asking the question,  ‘What can we design, build, create or change to improve school life at Pt England School?’. Working with a group of people we had to present a movie. Using the question given to us to create something we can use at school that could be for fun or to benefit our school. This is because our theme for this Term is ‘Make it work’. Our group included: Me (Swaimah), Zaria, Vika, Eleni, Lynette.

Plan: We first planned together on a piece of paper and discussed what our project is going to be. We all agreed to do a shoe rack because we have noticed that outside our classroom the shoes have been a mess. People have been throwing their shoes like animals. We thought that we could make a shoe rack exactly like mini cubbyholes. We sketched out the shoe rack and how it would look . We first thought that we would make a shoe rack with a storage place at the bottom. But then we knew it’ll take a lot of time to create. 

Supplies: We had to research the materials and wood for our project. We went online on Mitre-10 and Bunnings warehouse to find some materials. We found some wood and nails to use for our project. Our team came together and collected all the supplies. We all agreed with the prices that the materials were. We had a price limit so we kept the budget low. 

Problem: We had a problem with the project. Our problem was that our teacher who kindly went and bought the materials said that we couldn’t make our whole project because they didn’t have enough money. We just rolled with it but I was a bit sad because we worked hard for weeks/months and we couldn’t make our full project. Our teacher only gave us 9-10 planks of wood to use and some nails. 

Create Project: We planned out our project and placed them together. We then had to screw the wood planks together and then figure out if we did it right. It took some time to actually think really hard about where the planks of wood would go. It took us about 30 minutes or so to figure out our shoe rack. We then screwed it all together and made our final project. We then painted the shoe rack to give it a bit of a cool vibe. 

Thank you for watching My DLO video. Please leave a positive comment on my blog. Thank you! <3

2 thoughts on “DLO – Make It Work – Shoe Rack – The 5 Musketeers

  1. Kia ora Swaimah, I enjoyed watching your Make it work DLO that you and your group created. What a lot of time, effort and energy you put into your Shoe rack, amazing. If you could have created a shoe of your choice and there were no limits on materials etc, what would your shoe rack have looked like? Keep up the awesome work! Whaea Ange – Ahipara School teacher.

    1. Kia ora Whaea Ange, Swaimah here. We planned to make a better shorack at the start but our teacher said we couldn’t because it will be to “hard” for us to make. Thank you so much for commenting on my blog.

      Swaimah

Leave a Reply

Your email address will not be published. Required fields are marked *